Please use this identifier to cite or link to this item: http://hdl.handle.net/11458/3786
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorChung Rojas, Carlos Enrique
dc.contributor.authorDelgado Santiago, Roger Daniel
dc.date.accessioned2020-10-26T02:16:42Z
dc.date.available2020-10-26T02:16:42Z
dc.date.issued2019
dc.identifier.citationDelgado-Santiago, R. D. (2019). Aplicación de la filosofía Lean Construction en la etapa de ejecución del casco estructural de la obra: mejoramiento de los servicios de salud del centro de salud I-4 Picota, provincia de Picota - San Martín. Tesis para optar el grado de Ingeniero Civil. Facultad de Ingeniería Civil y Arquitectura, Universidad Nacional de San Martín, Tarapoto, Perú.es_PE
dc.identifier.urihttp://hdl.handle.net/11458/3786
dc.description.abstractEl presente trabajo de investigación se enfoca en la aplicación de la filosofía lean construction como sistema de planificación, control y mejoramiento de la productividad en un proyecto de construcción. El objetivo principal se centra en revertir una situación desfavorable mediante el empleo de la Filosofía Lean Construction en la etapa de ejecución del casco estructural de obra para lograr un avance acumulado ejecutado respecto a lo acumulado programado mayor al 80% para el quinto mes de ejecución de una obra cuyo plazo contractual es de trece meses. En el desarrollo del presente trabajo se describe los principales conceptos teóricos y el empleo de las principales herramientas de la filosofía Lean Construction (Layout de obra, sectorización, plan maestro, histograma del personal obrero, nivel general de actividades, carta balance), con la finalidad de que sea una guía para estudiantes y profesionales que quieran conocer más de esta filosofía. Los resultados obtenidos evidencian que mediante el empleo de la filosofía lean construction se optimizan los recursos, se reducen los trabajos no contributorios, se tiene un mejor planeamiento y control de la obra, por ende, mejora la productividad. Finalmente se puede concluir que gracias a la aplicación de la filosofía Lean Construction mejoró el sistema de producción, obtuvimos un mejor control de obra y gracias a ello se cumplió la meta trazada para el quinto mes de ejecución de obra.es_PE
dc.description.abstractThe following work of investigation was focuses on the application of the lean construction philosophy as a planning, control and productivity improvement system in a construction project. The main objective is to reverse an unfavorable situation through the use of the Lean Construction Philosophy in the stage of execution of the structural hull to achieve an accumulated progress executed with respect to the accumulated programmed greater than 80% for the fifth month of execution of a work whose contractual term is thirteen months. In the development of the present work, the main theoretical concepts and the use of the main tools of the Lean Construction philosophy (Layout of work, sectorization, master plan, histogram of the workers' staff, general level of activities, balance sheet) are described, with the purpose of being a guide for students and professionals who want to know more about this philosophy. The results obtained show that through the use of the lean construction philosophy, resources are optimized, non-contributory work is reduced, there is a better planning and control of the work, therefore, productivity is improved. Finally, it can be concluded that thanks to the application of the Lean Construction philosophy, the production system improved, we obtained a better control of the work and thanks to this the goal set for the fifth month of execution of the work was fulfilled.es_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Nacional de San Martín. Fondo Editoriales_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/deed.eses_PE
dc.sourceRepositorio - UNSMes_PE
dc.subjectLean Constructiones_PE
dc.subjectLast Planner Systemes_PE
dc.subjectPlanificaciónes_PE
dc.subjectProgramaciónes_PE
dc.subjectControl de obraes_PE
dc.titleAplicación de la filosofía Lean Construction en la etapa de ejecución del casco estructural de la obra: mejoramiento de los servicios de salud del centro de salud I-4 Picota, provincia de Picota - San Martínes_PE
dc.typeinfo:eu-repo/semantics/monographes_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.grantorUniversidad Nacional de San Martín. Facultad de Ingeniería Civil y Arquitecturaes_PE
thesis.degree.nameIngeniero Civiles_PE
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_PE
dc.publisher.countryPEes_PE
renati.author.dni46574146es_PE
renati.advisor.orcidhttps://orcid.org/0000-0002-3646-5550es_PE
renati.advisor.dni01089135es_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales_PE
renati.levelhttps://purl.org/pe-repo/renati/nivel#tituloProfesionales_PE
renati.discipline732267es_PE
renati.jurorMartinez Quiroz, Enrique Napoleones_PE
renati.jurorChavez Cachay, Santiagoes_PE
renati.jurorAlarcon Zamora, Jose Evaristoes_PE
item.fulltextWith Fulltext-
item.languageiso639-1es-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.grantfulltextopen-
item.cerifentitytypePublications-
item.openairetypeinfo:eu-repo/semantics/monograph-
Appears in Collections:(Br.) Ingeniería Civil
Files in This Item:
File Description SizeFormat 
CIVIL - Roger Daniel Delgado Santiago.pdfLean Construction, Last Planner System, planificación, programación, control de obra.3.13 MBAdobe PDFThumbnail
View/Open
Show simple item record

Google ScholarTM

Check


This item is licensed under a Creative Commons License Creative Commons